The pipes themselves are set out in several spirals covering the entire ground floor with a small gap where the shower will go. Eventually there will be thermostats in each room to control the temperature individually.
Despite telling us they would, the heating guys didn't come back to hang the solar panels so they will have to stay in the house when the next company come to put in the screed. They will come back once the screed is in to fire-up the boiler as this has to run to dry everything out.
No comments:
Post a Comment