Today a plasterer was on site to ensure the under-layer of plaster on the outside of the house is waterproof and flat, ready for the render.
We went up to see how he was getting on and we could see it already looked much better with the issues we pointed out to Allkauf on the phone already fixed. The grey stripe around the whole house (from the exposed polystyrene insulation added between the first and ground floor walls) had also been completely plastered over too.
The best news we had is that the render will be done on Monday next week rather than next spring as the weather is supposed to be good enough so it can dry. Excellent news as we can't get the garage delivered until the render is doe.